The wind turbine has arrived in Saint-Nazaire

The 2 MW wind turbine which will equip Floatgen has been unloaded at Saint-Nazaire harbour. Some minor modifications will be performed before being erected onto the floating foundation currently under construction.

Date: 
Wednesday, 15 June, 2016